Guide to the CF&I Archives – Work Stoppages Series | ||
Title | CF&I Archives – Work Stoppages Series | |
Dates | 1945-1990 | |
Identification | SCW-CFI-RG2-SG2.8-Series2.1.7 | |
Quantity | 4 boxes, INR-0795 through INR-0797, INR-1285 | |
Repository | CF&I Archives, Steelworks Center of the West, 215 Canal Street, Pueblo, CO 81004, Phone: 719-564-9086 |
Work Stoppages Series Scope and Content Note
The information in this series concerns strikes, slowdowns, sickouts, and related ways and means bargaining employees protested against the company. Departments in the Pueblo Plant and local unions related to the railroad are represented in this series. The series spans 1945 to 1990, the majority of the unionized period. By the 1940s, CF&I had shut down most of the mines, so the preponderance of records in this group relate to USWA strikes at the Pueblo steel mill. All of the major (and many minor) strikes are documented, including the lengthy and bitter strikes of 1949 and 1959. This series includes correspondence, memoranda, hearings, grievances, activity summaries, notices of hearings, personnel complaints, employee lists of eligible workers, union negotiations and plans, proposed pay adjustments and newspaper clippings.
Work Stoppages Series Arrangement
Information is arranged chronologically and by department.
Go to the Industrial Relations Records Group
Restrictions
Restrictions on access:
Certain materials are restricted due to privacy concerns. Please contact SCW staff for further information.
Restrictions on use:
Not all of the material in the collection is in the public domain. Researchers are responsible for addressing copyright issues. Please see the SCW copyright statement at
http://www.steelworks.us/newsite/index.php/archives/services-and-policies/copyright-information
.
Index Terms
Subject Terms:
Colorado Fuel and Iron Company.
Colorado Fuel and Iron Corporation.
Colorado Fuel and Iron Corporation. John A. Roebling’s Sons Corporation.
Description | Container | ||||
---|---|---|---|---|---|
Work Stoppages 1959-1968 |
| ||||
B of RT Strike-11/23-Dec 5, 1965 1965-1966 |
| ||||
Work Stoppage 11/23/65-12/5/65 (Railroad Trainmen) 1965 |
| ||||
Strike 1968 Stand-by Crews (All Locals) 1968 |
| ||||
Strike 1971 Stand-by Crews All Locals 1968-1971 |
| ||||
Strike-1965 Stand-by Crews (All Locals) 1965 |
| ||||
Strike-Contemplated 8/1/68 Plantwide 1968-1971 |
| ||||
Strike-Contemplated Sept 1, 1965 1965 |
| ||||
Pre-Strike UC Claims-1959 #1 1959 |
| ||||
Strike-1959 Start-Up Operations 1959 |
| ||||
State Unemployment Compensation Appeal Cases from the Strike Period beginning July 15, 1959. 1959 |
| ||||
No title 1959-1960 |
| ||||
General Hearing (UC) Information 1959-1960 |
| ||||
No title 1959-1961 |
| ||||
Work Stoppages 1946-1962 |
| ||||
State Unemployment Compensation Seamless Tube Mill Case Strike Period, 1956 1957-1959 |
| ||||
1959 Strike-State Unemployment Compensation Cases-Pre Strike Claims 1959-1962 |
| ||||
1959 Strike-Sub Claims 1959-1960 |
| ||||
Pre-Strike Claims #1 Correspondence w/ the State 1959-1960 |
| ||||
Hearings-Department Information Post Strike (Preparation) 1959 |
| ||||
1959 Resumption of Operations 1959-1960 |
| ||||
1959 Pre Strike Unemployment compensation Information-Arguments 1959 |
| ||||
R (Rail Finishing Employees) 1959 |
| ||||
Coke Plant 1959 |
| ||||
R-2 1959 |
| ||||
R-3 1959 |
| ||||
R-4 1959 |
| ||||
Miscellaneous Category Claims-Pre Strike) 1959 |
| ||||
Strike-1959 Stand-by Crews (All Locals) 1959 |
| ||||
Strike-1959 Winterizing the Plant 1959 |
| ||||
Strike-Actual July 1, 1956) 1956 |
| ||||
Strike-1956 Clippings 1956 |
| ||||
Strike-Actual July 1, 1955 1955 |
| ||||
Strike-Contemplated July 1, 1954 1954 |
| ||||
Strike-Clippings April 9, 1952 1952 |
| ||||
Strike-Actual 6/2/52-7/26/52 1952 |
| ||||
Strike-Actual 4/30-5/1 – 5/2, 1952 1952 |
| ||||
Strike-Contemplated April 9, 1952 1952 |
| ||||
Strike-Actual Oct. 1, 1949 1949 |
| ||||
Strike-Clippings July 16, 1949 1949 |
| ||||
Strike-Contemplated July 16, 1949 1949 |
| ||||
1946 |
| ||||
Work Stoppages 1945-1990 |
| ||||
Work Stoppages and Slowdowns-Language Developed for Potential Problems |
| ||||
Work Stoppages and Slowdowns-Independent contractors Striking (Research) 1976 |
| ||||
Work Stoppages and Slowdowns-Interpretation of a Legal Memo Concerning Strikes 1964-1975 |
| ||||
Work Stoppages and Slowdowns-Legal Responses 1965-1977 |
| ||||
Work Stoppages and Slowdowns-Sympathy Strike Interpretation 1976 |
| ||||
Work Stoppages and Slowdowns-General Correspondence 1977-1979 |
| ||||
Work Stoppages-Plantwide 1945-1969 |
| ||||
BOF-Slowdown August 26, 1975 1975 |
| ||||
Work Stoppage-Casting foundry June 2, 1977; Slow down 7/28/78 1977-1978 |
| ||||
Work Stoppages and Slowdowns-Wel Shop 05-20-80 1972-1980 |
| ||||
Central Shops-Work Stoppages and Slowdowns 1980 |
| ||||
Work Stoppages-Railroad Potential 1975 |
| ||||
Rail Strike, re UTU, Brotherhood of Railway and Airline Clerks (BRAC), the Union of Maintenance of Way employees and the Dining Car Employees Union Sept. 1970 1970 |
| ||||
Work Stoppages-Illegal Strike C and W, May 13, 1969 1969 |
| ||||
Disputes, Rail Dispute — 1967 Corporation General 1967 |
| ||||
Work Stoppages and Slowdowns Electrical and Mechanical Services (Si 1972 |
| ||||
Slowdown- Certified Letter / Blueslip 1990 |
| ||||
Work Stoppages Rail Mill Finishing (Slowdown) 1976 |
| ||||
Work Stoppages Rail Mill Finishing 1977 |
| ||||
Work Stoppage Rail and Blooming Mills-Rail Finishing 1977 |
| ||||
Work Stoppages Rail Mill Finishing 1977-1978 |
| ||||
Work Stoppages and Slowdowns-Roll Shops – Labor Disputes 1980 |
| ||||
Work Stoppages and Slowdowns-Roll Shops 1978 |
| ||||
Roll Shop “Sick-Out” on 02-25-75 1975 |
| ||||
Seamless Mill Slowdown, August 1990 1990 |
| ||||
Seamless Mill-Labor Disputes September, 1984 1984 |
| ||||
Seamless Mill Labor Dispute, April 1984 1984 |
| ||||
Work Stoppages and Slowdowns-Seamless Mill-General 1978 |
| ||||
Work Stoppages and Slowdowns-Seamless Mill 1979 |
| ||||
Work Slowdown – Seamless Quality Control EV Tables – February 24, 1981 1981 |
| ||||
Work Stoppages and Slowdowns- Continuous Caster – General 1978 |
| ||||
Work Stoppages and Slowdowns- Continuous Caster- February 5, 1977 1977 |
| ||||
Work Stoppages – Steel Production- General 1981 |
| ||||
Work Stoppages and Slowdowns- BOF – Week of November 4, 1979 1979 |
| ||||
Work Stoppages – Sunrise Mine July 1974 1975 |
| ||||
Work Stoppages and Slowdowns- Weld Shop (Sickout) 1972 |
| ||||
Work Stoppages and Slowdowns- Wire Mill Galvanizing (Sickout) 1972 |
| ||||
Population Control Weekly Projection 1977-1981 |
| ||||
Wildcat and other strike information 1963-1978 |
| ||||
Contracting Out Issues – Loss Of In-Plant Work 1963 |
| ||||
Industrial Engineering – Job Production Studies And Needs 1967-1968 |
| ||||
Promotion Recommendations-Wage Increases 1964 |
| ||||
Confidential Memos On Exempt Positions – Plant Expansions 1966 |
| ||||
Industrial Engineering Data – Job Descriptions 1969 |
| ||||
Surveys Of Ineligible Non-Exempt Bi-Weekly Salaried Foreman 1967 |
| ||||
Wage Surveys – Foremen 1967 |
| ||||
Monthly Salary Surveys 1967 |
| ||||
14 Inch Mill Forecasts And Requirements 1967-1970 |
| ||||
Relocation Plans For 14 Inch Mill 1970 |
| ||||
Ferro Processing Corporation 1968-1973 |
| ||||
Maintenance Department History 1967 |
| ||||
Analysis Of A10-A Report 1971-1973 |
| ||||
Strike Data – Railroads – Emergency Procedures (C&W) 1975-1978 |
| ||||
Minimum Rolling analysis For 25 Inch Mill 1971 |
| ||||
Colorado And Wyoming Wildcat Strike 1969 |
| ||||
Colorado And Wyoming Wildcat Strike 1969 |
|